LMS Route: Evesham to Birmingham
Brighton Road: mrbr147b
This close up of image "mrbr147" provides the viewer with
some idea of the platform structure, the platform furniture and the platform it
self. The building did not need to be too large being used for two waiting
rooms and the toilets. The platform's surface is made up of timbers laid
lengthways the wood being seasoned (dried) for at least a year if not
considerably longer. The edge of each plank would have been square cut not
tongue and grooved which would have prevented rainwater from escaping between
each plank.
back

|