|
|
|
London North Western
Railway:
Midland
Railway:
Stratford
Midland Junction Railway
|
|
LMS Route: Rugby to Leamington Spa LMS Route: Nuneaton
to Leamington LMS Route: Nuneaton to Leamington
Warwick (Milverton) Station: lnwrwar_stn1415
Looking in the direction of Kenilworth from the Leamington
end of the station with the water treatment plant clearly visible adjacent to
Milverton shed. In the 1930s the LMS had embarked on a major programme of
installing such plants across the country as the problem of hard water causing
lime scale in boilers had been identified as a significant cause of boiler
deterioration. Boilers in hard water areas required significant rectification
work as the lime scale would in the course of time eat into stays and steel
plating. The build up of sediment inside the boiler would also create hot spots
within the boiler and firebox preventing the water from both cooling the
plating as well reducing the heat raising capabilities of the boiler.
back
|
|
|