 | Bilton SidingsBilton Sidings Signal CabinBilton Sidings Signal Cabin became a fringe cabin to Rugby
						Power Signalling Box when Stage One was commissioned over the weekend Saturday
						12th to Monday 14th September 1964. The 1969 sectional appendix shows the
						remaining single line from Rugby to Southam Cement works at Long Itchington as
						'One Train Working'* The 'Staff' was an Annetts Key of the L&NWR Key
						Locking type and used to release the ground frame at Rugby Cement works. *Staff kept by Yard Forman at Rugby. 
 |  |   |