|
|
|
|
GWR Route: Banbury to Wolverhampton
Solihull Station: gwrs269
View of the replacement signal box which was larger than
original to accommodate the extra points and signalling. The box is obviously
only just commissioned as indicated by the timber planks lying on top of the
yet to be filled coal bunker. Whereas the toilet on the original was a small
extension outside of the door to the signal box this newer box had its toilet
under the cabin in the machine room as is evidenced by the soil stack rising
behind the doorway circa 1936.
back
|
|
|