|
|
|
|
GWR Route: Banbury to Wolverhampton
GWR Route: North Warwickshire Line
Birmingham Snow Hill Station: gwrbsh1191
View of the two water cranes located at the Southern end of
Platforms 7 and 12 which have been secured by chains for safety. Steam
locomotives required considerable amounts of coal and water and whereas their
tenders would normally carry enough coal for a day's work the water capacity
was too limited. Water columns would be located at strategic intervals
particularly at stations where trains might be expected to stop slightly longer
than for just dropping off or picking up passengers. The GWR provided water
cranes at Snow Hill station, so described because their horizontal arm would be
swung 90° from its secured position to above the tender. They were operated
by the large horizontal levers on the left and the chutes on the right were to
collect the excess water that would drip after use.
back
|
|
|