GWR Route: Alcester to Hatton Junction
GWR Route: North Warwickshire Line
Bearley Junction: gwrbj790a
Close up of image 'gwr790' showing the watering arrangement
from the aqueduct with fire-devil sited below the valve, to prevent the water
freezing. The branch stop signal was mounted on a concrete post, thought to
have been installed prior to the reopening of the branch in 1922. Several other
signals on the Alcester Branch are of a similar design.
Railway companies experimented with prefabricated concrete
and steel lattice signal posts at this time because of the lack of suitable
imported Baltic timber during WW1 and immediately after. Although wooden posts
were reintroduced, the high price and inconsistent quality resulted in trials
of tubular steel signal posts in 1929 and five years later tubular steel had
become the official replacement for wood.
back
 |