|
|
|
|
GWR Route: Hatton to Bearley and Alcester Branch
Bearley Station: gwrb783
The Hatton end of Bearley Station viewed from the road
bridge, showing the new platform extensions on 19th May 1939. Behind the new up
platform on the right is the station masters house, while beyond this and
partly obscured by the new footbridge and old weighbridge office is the goods
shed. Both the station masters house and the goods shed were part of the
original Stratford on Avon Railway station built in 1860. The arched doorway on
the right of the goods shed is the vehicular loading bay entrance. After July
1939 the down refuge siding in the foreground (see trap point and running line
independent disc signal) became the new down line and the point work and
independent disc signals seen here were removed.
Robert Ferris
back
|
|
|