GWR Route: Hatton to Bearley and Alcester Branch
Great Alne Station: gwrga799a
Close up of image 'gwrga799' the station and platform in
1947 looking towards Alcester. In the distance the level crossing gates
remained permanently shut as the track from this point had been disused for ten
years (see 'gwrga802').
There was no signal box at Great Alne, but on the opposite
side of track from the platform are two small lineside huts. The first hut
contained the five-lever West Ground Frame. Two levers controlled the goods
yard loop point work seen in the foreground of this picture and the other three
levers controlled the level crossing gate bolts and the up and down distance
signals. The black painted hut contained the lineside telephone equipment. The
two-lever East Ground Frame was situated at the other end of the goods yard
(see 'gwrga796a').
back
 |