GWR Route: Banbury to Wolverhampton
Leamington Spa Station - leamington_circus_1954
For the use of BRITISH RAILWAYS (WESTERN
REGION), |
|
Notice No.755 |
EMPLOYEES ONLY District Operating Superintendent's
Office |
|
(SEVEN FIVE FIVE) |
Birmingham, Snow Hill |
|
20th May 1954 |
Saturday and Sunday. May 22nd and 23rd,
1954. FOUR SPECIAL TRAINS WITH BERTRAM MILLS' CIRCUS - WALSALL
TO LEAMINGON SPA GENERAL.
Below are the schedules and formations of the
four special trains which will convey Bertam Mills Circus from Walsall to
Leamington Spa General on Saturday / Sunday next.
Saturday, May 22nd, 1954 Train No 1
Formation arriving Leamington Spa General |
|
Times |
Engine |
|
|
Arr. (p.m.) |
Dep. (p.m.) |
5 Horse Boxes |
|
Walsall |
- |
9.0 |
3 S.O.V.s |
|
Leamington Spa Avenue |
11.01 |
11.36 |
C.T. 1236 |
|
Leamington Spa General |
11.45 |
- |
B.B. 31315 |
|
|
|
|
Brake Van |
|
|
|
|
5 Bobols |
|
|
|
|
Brake Van |
|
|
|
|
= 325 tons approx.
This train will convey all the livestock and the vehicles
are to be berthed in the Down Bay. Horses to be watered at Leamington Spa
General at 6.0 a.m. Sunday. C.T. 1236 to be berthed with road access. 5
Bobols will be unloaded after the unloading of the Bobols on the second
train.
Train No 2
Formation arriving Leamington Spa General
|
|
Times |
Engine |
|
|
Arr. (p.m.) |
Dep. (p.m.) |
T.K. 744 |
|
Walsall |
- |
10.30 |
BSR 37547 |
|
Leamington Spa Avenue |
12.43 a.m. |
12.58 a.m. |
CCT 1232 |
|
Leamington Spa General |
1.5 a.m |
- |
CTO 996 |
|
|
|
|
CTO 385 |
|
|
|
|
CTO 5 |
|
|
|
|
Brake Van |
|
|
|
|
6 Bobols (unspecified) |
|
|
|
|
Bobol 57795 |
|
|
|
|
= 380 tons approx.
This train will be the first to be unloaded Bobol No
57795 to be berthed first on end dock stop block, followed by other six Bobols
in any order. When these have been unloaded the five Bobols off the first train
to be placed to the end dock. CCT 1232 to be berthed on stop block of Gas
Board's siding. 7 Circus employees will travel in TK 744, including Foreman
Shanley, who should be contacted immediately the train arrives.
Sunday, May 23rd, 1954 Train No 3
Formation arriving Leamington Spa General |
|
Times |
Engine |
|
|
Arr. (p.m.) |
Dep. (p.m.) |
TK 691 |
|
Walsall |
- |
1.0 |
CCT 1231 |
|
Leamington Spa Avenue |
3.3 |
3.18 |
Brake Van |
|
Leamington Spa General |
3.25 |
- |
10 Bobols |
|
|
|
|
Brake Van |
|
|
|
|
= 400 tons
Bobols to be placed to end dock on arrival. Passenger
vehicles to be berthed for off loading on to road vehicles. CCT 1231 to be
berthed for end unloading when all the bobols, off all trains, have been
unloaded.
Train No 4
Formation arriving Leamington Spa General |
|
Times |
Engine |
|
|
Arr. (p.m.) |
Dep. (p.m.) |
4 TK 691 (Nos 2970, 712, 679, 663) |
|
Walsall |
- |
3.0 |
Brake Van |
|
Leamington Spa Avenue |
5.3 |
5.18 |
Bobol 57841 |
|
Leamington Spa General |
5.25 |
- |
Bobol 57864 |
|
|
|
|
Bobol 57868 |
|
|
|
|
4 Bobols (unspecified) |
|
|
|
|
Brake Van |
|
|
|
|
= 390 tons approx.
Bobol Nos 57868, 57864 and 57841 to be first on end dock
stop blocks in any order, followed by the other 4 (unspecified) bobols in any
order. Circus Foreman Taylor will be in Circus vehicle No 17 and he should
be contacted immediately the train arrives.
ADVANCE MOVEMENT OF "KING POLE" BETWEEN
LEAMINGTON SPA GENERAL AND STRATFORD UPON AVON.
Monday and Tuesday, May 24th and 25th.
Bobol 57868 to be in position for loading on end dock at
Leamington Spa General at 2.0 pm Monday, May 24th. Loaded vehicle to be
despatched to Stratford upon Avon by the 7.45 pm freight hence due Stratford
upon Avon 9.28 pm.
Bobol with tractor to return to Leamington Spa General by
the 11.35 pm freight ex Honeybourne, Stratford upon Avon depart 12.40 am.
Leamington Spa General arrive 2.20 am.
Station Masters, Leamington Spa General and Stratford upon
Avon to arrange, latter in conjunction with Goods Agent.
SHUNTING POWER Shunting engine (51XX) to be
available at Leamington Spa General at 11.0 pm Saturday, May 22nd, for use as
required. Relief required. Station Master, Leamington Spa General, to provide
two shunters to work with this engine. Up Yard shunting engine to be
available at Leamington Spa at 3.0 am Sunday, May 23rd, to work 12 empty bobols
to Warwick Down Refuge Siding. Station Master Leamington Spa General, to
provide Guard.
LEAMINGTON SPA GENERAL. The following lines and
sidings to be cleared of traffic in readiness for the unloading operations:-
Bay Platform line Middle Road and Dock Sidings (both and dock
facilities) Outside Dock Sidings Middle Gas Siding Gas Board's Private
Siding.
CLEANING AND EQUIPPING OF STOCK. All horse Boxes
and S.C.V.s to be thoroughly cleaned and hosed out and lightly disinfected (but
not in the mangers). The Elephant Truck (C.C.T. 1236) to be cleaned with MILD
DISINFECTANT ONLY and bedding to be removed. THIS IS IMPORTANT. T.K.S and
other passenger vehicles to be cleaned and water tanks filled where
necessary.
LIGHTING. Special steps must be taken to see that
the lights, both electric and gas, in all vehicles are extinguished as soon as
possible after unloading. All lighted vehicles to be charged with gas or
electricity, as the case may be, prior to use on Wednesday, May 26th. It is
essential that the batteries in the elephant truck (C.C.T. 1236) shall be fully
charged and lighting in good order.
ADDITIONAL YARD LIGHTING. 12 Tilley lamps will be
provided at Leamington Spa. District Engineer will arrange.
GAS TANK. Additional Gas Tank to be despatched
from Tyseley to Leamington Spa General to arrive no later than 9.0 am Monday,
May 24th, for gassing Circus vehicles. Dostrict Motive Power Superintendent to
arrange.
EXAMINATIONS. All vehicles to be examined on
arrival and any deficiencies made good. District Outdoor C. & W. Engineer
to arrange.
STAFF. Operating Department supervision - Chief
Inspr. Barnes. Station Master, Leamington Spa General, to be on duty as
necessary. Commercial Dept. will provide staff for cleaning the livestock
vehicles. Station Master, Leamington Spa, to arrange cleaning TK
vehicles C. & W. Examiner - District Outdoor C. & W. Engineer to
arrange Police. Police Supt., Birmingham, will provide Police supervision
throughout the unloading operations. Motive Power Dept. will arrange an
Inspector to be on duty at Leamington Spa General.
GENERAL. The Circus Staff unload all vehicles and
animals under the supervision of Railway staff. They will also be responsible
for securing trailer, shackle screws, loading plates, etc. All traffic on
Bobols is loaded on low trailers with drawbars leading on to the end dock for
direct unloading. District Commercial Superintendent will arrange for an
additional set of bridging plates to be available.
District Engineer will arrange for a supply of 15 sleepers
to be available at Leamington Spa, for use as required. Sand to be available
for use if required on platform at Leamington Spa.
PLEASE ARRANGE ACCORDINLY, ADVISE ALL CONCERNED AND
ACKNOWLEDGE RECEIPT BY TELEPHONE USING THE CODE "ARNO CIRCUS 755".
For DL Pride
back

|