|
|
|
|
GWR Route: Banbury to Wolverhampton
Leamington Spa Station: gwrls850f
Close up of image 'gwrls850' shows the change in pattern on the
platform marking the point where the platform was extended from very soon after
building. The extension to both ends of the down platform and the west end of
the up platform was constructed later being in place by 1886 when a survey
indicated their existence. The main platforms were constructed of timber
framing with timber boarding laid parallel with the platform edge.
back
|
|
|