GWR Route: Banbury to Wolverhampton
Leamington Spa Station: gwrls242
The station was originally built with two running lines, one in
each direction adjacent to each platform, and two sidings between them in the
middle of the station for holding coaching stock. Access was available to the
middle sidings from both ends. John Copsey writes 'At a traffic Committee
meeting in December 1909, it was reported that work on carriage sidings had
been put in hand, and a proposal was made that the two middle sidings through
the station, used for stock storage, would be replaced by through running
lines'. Above we can see the P & W gang lifting the middle sidings in
preparation for laying the two through roads. C1910