LMS Route: The Shakespeare Route
Clifford Chambers Sidings: smjc100
The Ettington Limestone Company's transferred its limestone
from its crushing plant and quarries adjacent to the S & MT bridge. The
siding was protected by a ground frame and was reached by the wooden footbridge
over a lineside ditch. The loading bank has a good supply of neatly stacked
stone ready for transferring to the SMJ.
back

|