LMS Route: Rugby to Wolverhampton LMS Route: Nuneaton to
Leamington
Coventry Station: lnwrcov1580
Looking south towards the partly built passenger bridge which
connects all four platforms to the booking hall in the concourse. The two large
concrete columns are the lift shafts whilst the flight of steps to the
platforms abut the lift front of the shafts. The steelwork seen beneath the
photographer makes up the roof joists to the canopy covering the island
platform buildings and platform 2 and 3. On the left between the scaffolding
can be seen the five arched parcel depot which was completed by the time of
this photograph.
back
|